Patagonia M's Sandy Cay Pants - DQ

Patagonia M's Sandy Cay Pants - DQ

Salt Grey / SRGY / XS
£32.70 GBP
Skip to product information
Patagonia M's Sandy Cay Pants - DQ

Patagonia M's Sandy Cay Pants - DQ

£32.70 GBP
Taxes included. Shipping calculated at checkout.

Patagonia M's Sandy Cay Pants

Built for the Flats, Ready for the World

From long days on the skiff to hot, dusty layovers in faraway airports, the Patagonia M’s Sandy Cay Pants are your lightweight, do-it-all companion. Crafted from 100% recycled nylon, these quick-drying pants are designed to move from water to trail with ease. A stretch waistband adds next-level comfort, while smart pocketing—including a zippered thigh and rear pocket—keeps your essentials close and secure.

Finished with a DWR (durable water repellent) coating made without intentionally added PFAS and built in a Fair Trade Certified™ factory, they’re as responsibly made as they are versatile. Whether you're poling across saltwater flats or catching connections en route to your next adventure, Sandy Cay has you covered.


Key Features:

  • Lightweight, Quick-Drying Fabric
    Made with 100% recycled nylon plain weave treated with a DWR finish (made without intentionally added PFAS) to shed moisture and dry fast.

  • Stretch Waistband
    Alpha Stretch Waistband delivers a secure, flexible fit for all-day wear and movement.

  • Thoughtful Pockets
    Two mesh-draining front pockets, a zippered thigh pocket for easy-access security, and one zippered back pocket for wallet or travel essentials.

  • Fair Trade Certified™ Construction
    Made by workers who earn a premium for their labor, supporting ethical manufacturing practices.


Style No.: 82092
Weight: 215 g (7.6 oz)
Country of Origin: Made in Vietnam


For sun, surf, or stepping through airport terminals—Sandy Cay Pants are the ultimate lightweight travel essential.

Color
Size